● The (75) process analyzes the effect of risk events and assigns a numerical ra
● The (75) process analyzes the effect of risk events and assigns a numerical rating to those risks.
A.Risk Identification
B.Quantitative Risk Analysis
C.Qualitative Risk Analysis
.Risk Monitoring and Control
正确答案:B
词条内容仅供参考,如果您需要解决具体问题
(尤其在法律、医学等领域),建议您咨询相关领域专业人士。